VAL Electrical Limited
page-banner-shape

Featured Projects

E-Sports Gaming Lounge- Aldgate East, London

XP Tavern

This was one of the most ambitious and fast-paced projects we’ve taken on. Starting with an empty retail unit, we helped bring our client’s vision of a luxury e-sports lounge, bar, and pizzeria to life — all in just 9 weeks from planning to handover.

There were a lot of design changes and brainstorming along the way, but we made it work and delivered a high-spec finish throughout.

 

Some numbers:

2.3km of RGB LED strip lighting

6km of network cabling

Nearly 20km of electrical wiring

 

From lighting and power to data and AV, we handled the full electrical installation. Safe to say it’s one of the most intense (and rewarding) jobs we’ve done yet.

Client:
XP Tavern
Category:
Entertainment venue
Timeframe:
March 2025 - June 2025

Project summary

We carried out the full installation of electrical systems, fire detection, IT infrastructure, CCTV, and HVAC controls.
The project required careful planning and detailed compliance work, including full electrical calculations and the design of a service room housing a 250A main panel with four 125A distribution boards, each with its own check meter for accurate monitoring.
At the handover stage, we also prepared clear operation and maintenance manuals to ensure the building can be managed safely and efficiently going forward.

What sets us apart is our ability to handle complex, multi-service projects from start to finish. By bringing electrical, safety, IT, and HVAC systems together under one coordinated installation, we saved the client both time and unnecessary costs, while guaranteeing full compliance with industry regulations. Our proactive approach and attention to detail meant the client could move forward with confidence, knowing every system was designed for long-term safety, efficiency, and reliability.

Proton Beam therapy center- Warren Street, London

UCHL Grafton Way Building

Our company was contracted to support one of the world’s leading medical systems providers on a high-profile project at University College Hospital, London. The scope of work involved the installation and integration of advanced medical technologies, including proton beam accelerators, X-ray machines, linear accelerators, as well as supporting audiovisual and data infrastructure such as CCTV systems and data servers.

All work was executed in accordance with detailed technical drawings provided by the client and subject to daily approval by the Lead Engineer. This project was a valuable opportunity for our team to apply and enhance our expertise in interpreting complex schematics and delivering high-precision installations within a highly regulated medical environment.

Client:
Varian Medical Systems
Category:
Medical centre
Timeframe:
Oct 2020 - March 2021

Project summary

Working within a highly regulated medical environment, our team successfully delivered complex installations with precision and compliance, supporting one of the UK’s most advanced healthcare facilities.

We are proud that we've helped to deliver a leading cancer treatment center in a heart of London, which will help cure thousands of people who are suffering from that disease. 

Our involvement in this project not only demonstrates our technical capability but also our commitment to projects that make a real difference. By combining advanced engineering expertise with meticulous attention to detail, we ensured that every system was installed to the highest standard, giving clinicians the tools they need to provide world-class care for patients.

Key Achievements

  • Delivered seamless installation of highly advanced medical technologies

  • Ensured full compliance with strict healthcare and safety regulations

  • Accurately interpreted and executed complex technical drawings

  • Coordinated with client engineers for daily approvals and quality assurance

  • Enhanced hospital infrastructure with reliable audiovisual, CCTV, and data systems